This is a staging area for material for which JRA3 is fully or partially responsible in the GN4-2 PLM Processes.
Any operational material is available at SA2.
The matrix of responsibilities for transition to production is also at SA2
Target Gate: None. In production.
NIF:
CBA:
PID:
Roadmap:
Service Description: GN3plus PLM Version; GN4-2 SA2 Operations Version.
Service Policy: https://technical.edugain.org/documents - Declaration v2, Consitution v2, other supplemental policies inc. CoCo v1.
Service Design Documents:
Branding: Materials
Target gate: Pilot
Roadmap: Feature in main eduGAIN roadmap.
Service Description:
Service Policy:
Service Design doc: Draft in progress
Pilot plan:
Branding/visibility:
Target gate: Pilot
CBA:
Roadmap: Feature in main eduGAIN roadmap.
Service Description:
Service Policy:
Service Design doc: Draft in progress
Pilot plan:
Branding/visibility:
Target gate: Pilot
CBA:
Roadmap: Feature in main eduGAIN roadmap?
Service Description:
Service Policy:
Service Design doc:
Pilot plan:
Branding/visibility:
Target gate: Production
CBA:
Roadmap: Feature in main eduGAIN roadmap?
Service Description:
Service Policy:
Service Design doc:
Operational Requirements:
Operational Docs:
OLA:
Operational Processes:
User Support:
Branding/visibility:
Target gate: Design
CBA:
PID:
Roadmap: Feature in main eduGAIN roadmap, TBD on representing individual roadmap
High level baseline Service Description:
Service Policy:
Service Design doc:
Branding/visibility: OIDC Profile of eduGAIN
Target gate: Pilot
CBA: (GN4-1 format) - rebaseline to payback schedule during pilot
Roadmap:
Service Description: Section 11 of CBA
Service Policy:
Service Design Documents:
Pilot Plan: Draft
KPIS: Section 5 of CBA
Branding:
Target gate: Pilot
CBA: In Progress
PID: How does this relate to the GN4-2 workplan?
Roadmap:
Service Description: COPaaS.pptx (Needs updating/customising)
Service Policy:
Service Design Documents: Functional Architecture ; Technical Architecture ; VM Platform
Pilot Plan: TBC - Umbrella in Q1 2017...what else?
Branding: In progress
Baselined Operational Reqs: In prgress
Target gate: Design
CBA:
Baselined PID:
Baselined Roadmap:
Baselined Service Description:
Baselined Service Policy:
Service Design Documents:
Target gate: Design
CBA:
PID:
Service Description:
Service Policy:
Service Design doc:
Roadmap:
Branding/visibility:
Target gate: Design
CBA:
PID:
Service Description: Product Output is BCP documents. How to represent?
Service Policy: Product Output is BCP documents. Policy BCP can be developed, is this what is wanted?
Service Design doc:
Roadmap: Product Output is BCP documents.
Branding/visibility: GÉANT/EC to be acknowledged as sponsor of work. Material to be available on GÉANT website as White Papers/BCP documents.
Target gate: Design? Pilot?
CBA:
PID:
Service Description: Product Output is standards, not a service. How to represent?
Roadmap: Product Output is standards, not a service. How to represent?
Service Policy: Product Output is standards, not a service. How to represent?
Service Design doc:
Branding/visibility: GÉANT/EC to be acknowledged as sponsor of work.
Target gate: None, in production.
NIF:
CBA:
PID:
Roadmap:
Service Description:
Service Policy:
Service Design Documents:
Target gate: Pilot
CBA:
Roadmap:
Service Description:
Service Policy:
Service Design Documents:
Pilot Plan:
KPIS:
Branding: TBD